Pictures of the G0 Superconducting Magnet System
Collections of photos of G0 SMS components under construction and assembly
can be viewed from the links below. Note: if you
would rather view these photos with a viewer other than your browser,
you can download them from subdirectories at
ftp://ftp.npl.uiuc.edu/pub/G0/sms/pictures
-
G0 SMS support in the UIUC high bay area
- UIUC, October 14, 1997.
-
G0 coil hardware: its testing and fabrication
- BWXT, February 1998.
-
Water-jet cutting of octagon
ring components - BWXT, January 1998.
-
Coil-winding machinery: the
components and the system under test with a wooden mock-up
of the G0 bobbin - BWXT, February 1998.
-
The first collimator parts
(toaster, lead, aluminum plates, etc.) at UIUC NPL
in preparation for assembly - UIUC, June 2 and 4, 1998.
-
Winding the first coil and conductor cross
section - BWXT, June 5, 1998.
-
Casting the lead alloy collimator blocks
- Vulcan Lead, May, 1998.
-
Casting the lead alloy collimator blocks (with commentary and
photos from Bartoszek Engineering)
- Vulcan Lead, May, 1998.
-
Assembly of the first collimator in the
toaster - UIUC, Mid-June, 1998.
-
Assembly of the first collimator in the
toaster (with commentary and photos from Bartoszek
Engineering) - UIUC, Mid-June, 1998.
-
The first collimator to be completed as well
as other collimator parts and toasters in preparation
- UIUC NPL, July 10, 1998.
-
The winding of the first
coil with pictures showing the second layer winding
- BWXT, July 15, 1998.
-
Paul Brindza's visit
to BWXT
- BWXT, September 15, 1998.
-
Vacuum test hardware, window boxes at UIUC, and
the proposed site for the LN2 tank at UIUC
- UIUC NPL, September 16, 1999.
-
LN2 tank installation at UIUC, Vacuum hardware, etc.
- UIUC NPL, November 18, 1999.
-
Vacuum and presure tests of 0.020" G0 Exit Windows
- UIUC NPL, December 13, 1999.
-
More pictures of vacuum and presure tests
of 0.020" G0 Exit Windows thanks to Bartoszek Engineering
- UIUC NPL, December 13, 1999.
-
Pictures of parts of the SMS from
BWXT during January 2000
thanks to BWXT
- BWXT, January 14, 2000.
-
Exit windows after chemical milling from
0.020" to 0.014"
- UIUC NPL, February 13, 2000.
-
Beginning of G0 cold mass assembly and
cryostat fabrication.
- BWXT, March 21, 2000.
-
The magnetic verification gantry at TRIUMF
- BWXT, March 23, 2000.
-
A "movie" of one of the tests 0.020"
exit window
- UIUC NPL, December 13, 1999.
-
Magnetic verification
alignment test setup
- UIUC, April 12, 2000.
-
G0 cold mass assembly and cryostat
- BWXT, April 17, 2000.
-
Inspection of the G0 cryostat vessel
- Craft, May 3, 2000.
-
Test fit of LHE dewar at UIUC
- UIUC NPL, May 3, 2000.
-
Pictures of G0 SMS fabrication in May 2000 at BWXT
- BWXT, May 8, 2000.
-
Pictures of the cryostat vessel on May 17, 2000
- Craft, May 17, 2000.
-
Preparation of the vessel for factory leak check
- Craft, June 5-9, 2000.
-
Cryo-reservoir under fabrication
- BWXT, June 12, 2000.
-
Factory leak check of the vacuum vessel
- Craft, June 14, 2000.
-
Details of the feet of the Magnetic Verification Gantry
- TRIUMF, June 21, 2000.
-
Pictures of G0 SMS Fabrication in July '2000 at BWXT
- BWXT, July 11, 2000.
-
Pictures of G0 SMS Vessel and Cold Mass in late July '2000 at BWXT
- BWXT, July 28, 2000.
-
Optical verification target insertion
- BWXT, August 3-4, 2000.
-
SMS components at BWXT
- BWXT, August 10-18, 2000.
-
Pictures at UIUC of the magnetic
verification gantry
- UIUC, August 18, 2000.
-
Pictures of the August NPL Flood
- UIUC, August 23, 2000.
-
SMS components at BWXT
- BWXT, September 7 and 22, 2000.
-
Activity in the NPL high bay
- UIUC, September 25, 2000.
-
Progress at BWXT
- BWXT, September 28, 2000.
-
Calibration and testing of the Gantry
- UIUC, October 9-10, 2000.
-
Progress at BWXT
- BWXT, October 4-10, 2000.
-
Up-ending the G0 SMS magnet
- BWXT, October 11, 2000.
-
Cold optical verification of the G0 SMS magnet
- BWXT, October 15-25, 2000.
-
Pictures of the entry to the "barn" at UIUC
- UIUC, October 26, 2000.
-
Parts of the laser alignment system at UIUC
- UIUC, November 2, 2000.
-
What the magnet will see on its trip to UIUC
- November 4-5, 2000.
-
Warm optical verification
- BWXT, November 6, 2000.
-
Arrival of the Flexible Transfer Line
- UIUC, November 13, 2000.
-
Details of the Gantry and Laser Alignment System
- UIUC, December 11, 2000.
-
Arrival Magnet Truck #1 at UIUC
- UIUC, December 12, 2000.
-
Work on the SMS at UIUC in January
- UIUC, January 7-21, 2001.
-
Cryostat weld removal at UIUC
- UIUC, January 29, 2001.
-
Preparations in February
- UIUC, February 14, 2001.
-
The gantry (a report from Scott Teige of IU and Hall D)
- UIUC, February 21, 2001.
-
Transfer line and control system installation and gantry improvements
- UIUC, February 23-26, 2001.
-
Gantry improvements
- UIUC, March 7, 2001.
-
Transfer line presure check
- UIUC, March 9-11, 2001.
-
JT Valve Holddown Nut
- JLab, March 14, 2001.
-
The stairway and work on cryo connections
- UIUC, March 20-23, 2001.
-
Planned exhaust plumbing (before welding)
- UIUC, April 2, 2001.
-
Vessel relief screen inspection
- UIUC, May 30, 2001.
-
Vessel pressure test
- UIUC, May 30, 2001.
The following are still UNDER CONSTRUCTION. They will be updated soon.
-
Upstream Head Removal
- UIUC, January 2, 2002.
-
First View of Plumbing
- UIUC, January 2, 2002.
-
UIUC January 4, 2002
- UIUC, January 4, 2002.
-
UIUC January 8, 2002
- UIUC, January 8, 2002.
-
UIUC January 9, 2002
- UIUC, January 9, 2002.
-
Downstream Head Removal
- UIUC, January 10, 2002.
-
The Patient
- UIUC, January 15, 2002.
-
Andy's Shearpin
- UIUC, January 21, 2002.
-
UIUC January 22, 2002
- UIUC, January 22, 2002.
-
Ten Dewar Test
- UIUC, January 24, 2002.
-
Shearpin
- UIUC, January 25, 2002.
-
FCL being taken out
- UIUC, February 12, 2002.
-
Pie MLI
- UIUC, February 18, 2002.
-
Power supply connectors
- UIUC, March 1, 2002.
-
Trans. MLI 1st Ten
- UIUC, March 3, 2002.
-
Trans. MLI
- UIUC, March 4, 2002.
-
Trans. MLI 2nd Ten
- UIUC, March 4, 2002.
-
Trans. MLI Interference
- UIUC, March 4, 2002.
-
Clamps
- UIUC, March 5, 2002.
-
Power Supply being shipped out
- UIUC, March 7, 2002.
-
Weighing the magnet
- UIUC, March 7, 2002.
-
Conductor Clamps
- UIUC, March 8, 2002.
-
Cernox sensors
- UIUC, March 8, 2002.
-
Transition Lead Voltage Taps
- UIUC, March 12, 2002.
-
Magnet Shipping form UIUC to JLab
- UIUC, March 19, 2002.
-
Magnet Arrival and Installation at JLab
- JLab, March 25-28, 2002.
-
Re-assembly of the Magnet at JLab
- JLab, April 1-13, 2002.
-
Work on the SMS at JLab
- JLab, April 14-26, 2002.
-
Strain gauge Wheatstone bridge module
- JLab, April 16, 2002.
-
The target in Hall C
- JLab, April 17-26, 2002.
-
The Hall B Boom
- JLab, April 26, 2002.
-
JT4 Valve Problem
- JLab, May 16, 2002.
-
Test Fit of Detectors to SMS
- JLab, May 17, 2002.
-
Leak checking the SMS
- JLab, May 17-21, 2002.
-
Looking Inside the LN2 Bayonet
- JLab, June 26, 2002.
-
Taking the Pie Piece Off
- JLab, June 27, 2002.
-
Readying the SMS and FW to Mate
- JLab, July 09, 2002.
-
LN2 Bayonet
- JLab, July 13, 2002.
-
Transition Port Wiring
- JLab, July 14, 2002.
-
New Rupture Disc
- JLab, July 22, 2002.
-
Leads and Hoses
- JLab, September 11, 2002.
-
JT valves
- JLab, October 4, 2002.
-
Helium Vent through Parallel Plate Relief Valve
- JLab, October 25, 2002.
-
SMS Moved Offline
- JLab, February 3, 2003.
-
Preparation for SMS Turn-around
- JLab, August 17, 2004.
-
The SMS Turn-around
- JLab, August 23, 2004.
-
The Afterburner, Mark II
- UIUC, October 17, 2005.
-
The beginning of SMS back-angle installation
- JLab, October 21-26, 2005.
-
Top of the Power Supply
- JLab, January 15, 2006.
-
Connections on the ZFCT "head"
- JLab, January 17, 2006.
-
Dump Switch Cleaning and Inspection
- JLab, January 27, 2006.