| 8:30-8:50 |
Welcome/ThankYou/Summary of G0 status
(G0-03-006,
.pdf ,
.ppt.gz )
|
Beck |
| 8:50-9:05 |
Budget Status/Schedule |
Lung |
| 9:05-9:20 |
Brief Status Reports on Subsystems
| 9:05-9:20 |
Magnet
(G0-03-007,
.pdf ,
.ppt.gz )
|
Spayde |
| 9:20-9:35 |
Target
(G0-03-008,
.pdf ,
.ppt.gz )
|
Covrig |
| 9:35-9:55 |
Detectors/Shielding
(G0-03-009,
.pdf ,
.ppt.gz )
(G0-03-010,
.pdf ,
.ppt.gz )
|
Breuer/Kox |
| 9:55-10:15 |
Beam
(G0-03-011,
.pdf )
|
Pitt |
| 10:15-10:30 |
Polarimeter
| Gaskell |
| 10:50-11:10 |
Electronics
(G0-03-012,
.pdf ,
.ps.gz )
(G0-03-013,
.pdf )
|
Furget/Quinn |
| 11:10-11:30 |
DAQ
(G0-03-014,
.pdf ,
.ps.gz )
|
King |
| 11:30-12:00 |
Overview of Analysis Progress
(G0-03-015,
.pdf ,
.ppt.gz )
|
Roche |
|
| 12:00-12:15 |
Backangle progress/schedule
(G0-03-016,
.pdf )
|
Lee |
| 1:30-3:30 |
Parallel Working Groups - ARC Auditorium, 231, 233
| Beam Working Group |
Pitt |
Analysis Working Group
Update of the Deadtime Correction for the French Electronics
(G0-03-018,
.pdf ,
.ps.gz )
|
Batigne |
Update of the Q2 Determination
(G0-03-019,
.pdf ,
.ps.gz )
|
Batigne |
North American Deadtime 70 ns?
(G0-03-020,
.pdf ,
.ps.gz )
|
Liu |
Dilution of the Elastic Proton Asymmetry by Inelastic Events
(G0-03-021,
.pdf )
|
Hannelius/Guillon |
|
Roche/Beise |
Electronics Working Group
Deadtime Studies for NA Electronics
(G0-03-023,
.pdf )
|
Biselli |
CFD Tests
(G0-03-024,
.pdf ,
.ps.gz )
|
Furget |
Buddies for the NA Detectors
(G0-03-025,
.pdf )
|
Kuhn |
Results of Studies of DMCH No. 9
(G0-03-026,
.pdf ,
.doc.gz )
|
Bimbot/Guler |
Single Counting (CFD and MT) Effects on DMCH's Behaviour
(G0-03-027
.pdf ,
.doc.gz )
|
Bimbot |
CLK and Y0 Status
(G0-03-028,
.pdf )
| Quinn |
|
Furget/Quinn |
|
| 3:30-4:30 |
Parallel Working Groups - ARC Auditorium, 231, 233
| Analysis/Beam/Electronics joint |
Roche/Beise |
| Back Angle Run |
Lee/Roos |
Background/Detectors
Status of Detectors and Fastbus DAQ
(G0-03-022,
.pdf ,
.ppt.gz )
|
Breuer/Kox |
|
| Plenary Session - ARC Auditorium |
| 4:30-5:00 |
Discussion of logistics for next run (lessons from 1st, planning for 2nd)
(G0-03-029,
.pdf ,
.ps.gz )
|
Armstrong/Pate |
| 5:00-5:30 |
Discussion/Homework Assignments |
Beck |
| 9:00-9:20 |
Report of Beam Working Group
(G0-03-017,
.pdf )
|
Pitt |
| 9:20-9:40 |
Report of Analysis Working Group
(G0-03-039,
.pdf ,
.ppt.gz )
|
Beise |
| 9:40-10:00 |
Report of Electronics Working Group
(G0-03-031,
.pdf )
|
Furget/Quinn |
| 10:00-11:20 |
Discussion/Development of Urgent "To Do List" |
Beck |
| 11:20-12:00 |
Physics Discussion
| Radiative corrections |
Arvieux |
Inelastic Proton Under the Elastic Peak
(G0-03-030,
.pdf ,
.ppt.gz )
|
Réal/Kox |
Scaling of "Photoproduction" Rates
(G0-03-032,
.pdf ,
.ppt.gz )
|
Martin |
|
| 1:30-2:45 |
Back Angle Run (Progress)
Cerenkov-CED Support Frame: Status
(G0-03-033,
.pdf )
|
Lee |
CED Fabrication
(G0-03-034,
.pdf )
|
Lee |
Status of CED Foam Support Studies
(G0-03-035,
.pdf ,
.ppt.gz )
|
Wells |
The Cerenkov Detectors: Summary and Next Steps
(G0-03-036,
.pdf )
| Porcelli |
Status of North American Backward Angle Electronics
(G0-03-037,
.pdf ,
.ppt.gz )
|
Wells |
Status of the French Backward Angle Electronics
(G0-03-038,
.pdf ,
.ps.gz )
|
Furget |
|
| 2:45-3:00 |
Summary/Discussion of back angle plans and schedule
(G0-03-040,
.pdf ,
.doc.gz )
| Roos |
| 3:30-5:00 |
Parallel Working Groups - ARC Auditorium, 231, 233
|
Back Angle Run |
Lee/Roos |
|
Analysis |
Roche/Beise |
|
Modifications (shielding/target/etc.) |
Kox |
|
| Plenary Session - ARC Auditorium |
| 5:00-5:30 |
General Discussion |