The development of documentation for the operation of the G0 experiment is of primary concern to the collaboration and the laboratory, and has been a priority identified by the Readiness Review Committees for G0. Documents related to this effort are listed below:
The documents listed below describe the status and management of the G0 project. Generally, management reports are produced monthly by the G0 Management Team, to summarize the cost and schedule of the entire project, and by the BWXT Project Manager, to summarize the schedule of the Superconducting Magnet System (SMS).
| G0 Doc. No. | |
|---|---|
| G0-98-019 |
The G0 Management Plan (Jefferson Lab E91-017)
- A. Lung, D. H. Beck and S. Williamson,
November 16, 1998 (Gnu-zipped tar archive of postscript files, 817 kb) (Gnu-zipped tar archive of sources, 273 kb) |
| G0-99-039 |
First G0 Project Monthly Progress Report, Period ending 2/15/99
- A. Lung, W. Schneider, G. Smith, S. Williamson,
April 23, 1999 (Gnu-zipped postscript, 68 kb) (Gnu-zipped MS Word, 10.9 kb) |
| G0-99-029 |
G0 Project Monthly Progress Report, Period ending 4/15/99
- A. Lung, W. Schneider, G. Smith, S. Williamson,
April 23, 1999 (Gnu-zipped postscript, 55.1 kb) (Gnu-zipped MS Word, 11.6 kb) |
| G0-99-040 |
G0 Project Monthly Progress Report, Period ending 6/15/99
- A. Lung, S. Pate, W. Schneider, G. Smith, S. Williamson,
July 20, 1999 (Gnu-zipped postscript, 55.3 kb) (Gnu-zipped MS Word, 15.0 kb) |
| G0-99-042 |
G0 Project Monthly Progress Report, Period ending 8/15/99
- A. Lung, S. Pate, W. Schneider, G. Smith, S. Williamson,
September 9, 1999 (Gnu-zipped postscript, 68.8 kb) (Gnu-zipped MS Word, 10.8 kb) |
| G0-99-044 |
G0 Project Monthly Progress Report, Period ending 9/15/99
- A. Lung, S. Pate, W. Schneider, G. Smith, S. Williamson,
September 21, 1999 (Gnu-zipped postscript, 81.6 kb) (Gnu-zipped MS Word, 29.9 kb) |
| G0-99-048 |
G0 Project Monthly Progress Report, Period ending 10/15/99
- A. Lung, S. Pate, W. Schneider, G. Smith, S. Williamson,
November 5, 1999 (Gnu-zipped postscript, 70.4 kb) (Gnu-zipped MS Word, 11.7 kb) |
| G0-00-049 |
G0 Project Monthly Progress Report, Period ending 2/15/00
- A. Lung, S. Pate, W. Schneider, G. Smith, S. Williamson,
February 15, 2000 (Gnu-zipped postscript (scanned), 541 kb) |
|
Also available are Monthly Management Reports |
Minutes of the G0 Project Management Meetings
| G0 Doc. No. | |
|---|---|
| G0-93-002 |
PAC update
- The G0 Collaboration, December, 1993 (Gnu-zipped postscript, no figures, 140 kb) (Gnu-zipped LaTeX source, no figures, 48 kb) |
| G0-97-012 |
Measurement of the Parity Violating Asymmetry in the N -> DELTA Transition
(DRAFT)
- S. P. Wells, N. Simicevic and
K. Johnson and the G0 Collaboration,
December 12, 1997 (Gnu-zipped postscript, 1.2 Mb) |
| G0-98-036 |
PAC Jeopardy Proposal, The G0 Experiment (Originally E91-017)
- The G0 Collaboration, December 16, 1998 (hypertext) (Gnu-zipped postscript, 386 kb) (Gnu-zipped tar archive of LaTeX source, 331 kb) |
| G0-99-018 |
G0 Progress Review 1999 - The G0 Collaboration,
April, 1999 (Gnu-zipped postscript, 1.03 Mb) (Gnu-zipped tar archive of sources, 971 kb) |
| G0-99-023 |
G0 Progress Review
- B. Barish (editor), May 22, 1999 (Cover Letter - Gnu-zipped postscript, 8.8 kb) (Final Report - Gnu-zipped postscript, 34.4 kb) (Cover Letter - Gnu-zipped pdf format, 3.6 kb) (Final Report - Gnu-zipped pdf format, 31.2 kb) |
| G0-99-054 |
The G0 Experiment, Forward Angle Measurements (Proposal to PAC17)
- The G0 Collaboration, December 13, 1999 (hypertext) (Gnu-zipped postscript, 338 kb) (Gnu-zipped tar archive of LaTeX source, 279 kb) |
| G0-99-058 |
Report of the January 26-28, 1999 Meeting of the Jefferson
Lab Program Advisory Committee, PAC15
- B. Filippone, chair, February, 1999 (Gnu-zipped postscript, 37 kb) (Gnu-zipped Portable Document Format, 99 kb) |
| G0-00-001 |
Technical Advisory Committee Comments to PR-00-006 (The G0 Experiment,
Forward Angle Measurements) and preliminary responses
(DRAFT)
- D. Beck, January 5, 2000 (ASCII Text, 6.1 kb) |
| G0-00-004 |
A Short (one-page) Description of E00-006, the G0 Experiment
- D. Beck, February 16, 2000 (hypertext) (Postscript, 53.8 kb) (Portable Document Format (PDF), 9.2 kb ) (MS Word, 27.6 kb) |
| G0-00-011 |
Jefferson Lab Beam Request for G0 Commissioning
- February 29, 2000 (Gnu-zipped postscript, 1.8 Mb) |
| G0-00-013 |
Report of the January 26-28, 2000 Meeting of the Jefferson
Lab Program Advisory Committee, PAC17
- D. Geesaman, chair, February, 2000 (Gnu-zipped postscript, 1.1 Mb) (Gnu-zipped Portable Document Format, 282 kb) |
| G0-00-016 |
Memo: Summary of the JLab Meeting on Policies for Setting
Polarization at the Injector
- C. Sinclair, February 7, 2000 (Gnu-zipped postscript, 41 kb) (Gnu-zipped MS Word, 6.5 kb) |
| G0-00-024 |
G0 Progress Review 2000 - The G0 Collaboration,
June 2000 (Gnu-zipped postscript, 8.0 Mb) (Gnu-zipped tar archive of sources, 8.0 Mb) (hypertext) |
| G0-00-030 |
G0 Progress Review Committee Final Report
- B. Barish (editor), June 28, 2000 (Gnu-zipped postscript (scanned in), 473 kb) |
| G0-00-033 |
G0 Readiness Review I - The G0 Collaboration,
August 14, 2000 (Gnu-zipped postscript, 5.1 Mb) (Gnu-zipped tar archive of sources, 5.1 Mb) |
| G0-00-038 |
Report of the First G0 Readiness Review - D. Mack (editor),
September 13, 2000 (Gnu-zipped postscript, 218 kb) |
| G0-01-001 |
Letter to the PAC19 Chairman Donald Geesaman and Larry Cardman
Concerning G0 Plans for Back-angle Running.
- D. Beck and The G0 Collaboration, Jan 10, 2001 (Gnu-zipped postscript, 13.1 kb) (Gnu-zipped MS Word, 3.7 kb) |
| G0-01-002 |
Letter to Larry Cardman
Concerning Scheduling of G0 Commissioning
- D. Beck and The G0 Collaboration Executive Committee, Jan 11, 2001 (Gnu-zipped postscript, 17.5 kb) (Gnu-zipped MS Word, 4.3 kb) |
| G0-01-013 |
G0 Progress Review 2001 - The G0 Collaboration,
May 25, 2001 (Gnu-zipped postscript, 10.8 Mb) (Gnu-zipped tar archive of LaTeX source, 10.8 Mb) |
| G0-01-014 |
The G0 Experiment, Backward Angle Measurements,
a Proposal to PAC20
- The G0 Collaboration,
May 2001 (Gnu-zipped postscript, 6.74 Mb) (Gnu-zipped tar archive of LaTeX source, 6.64 Mb) |
| G0-01-015 |
Measurement of the Parity Violating Asymmetry in
the N->DELTA Transition (Originally E97-104), a Proposal to PAC20
- S. P. Wells (cospokesman), N. Simicevic
(cospokesman), K. Johnston, and T. A. Forest,
and The G0 Collaboration,
June 1, 2001 (Gnu-zipped postscript, 6.81 Mb) (Gnu-zipped tar archive of LaTeX source, 6.71 Mb) |
| G0-01-027 |
G0 Progress Review, June 6-7, 2001
- B. Barish (editor), June 28, 2001 (Gnu-zipped postscript, 152 kb) (Gnu-zipped MS Word, 18.7 kb) |
| G0-01-031 |
PAC 20 Proposal (P-01-115) Measurement of the Parity Violating Asymmetry in the N->DELTA Transition
(presentation transparencies)
(DRAFT)
- S. P. Wells (cospokesman), N. Simicevic
(cospokesman), T. A. Forest and K. Johnston
and The G0 Collaboration,
July 12, 2001 (Gnu-zipped tar archive of postscript files, 7.51 Mb) |
| G0-01-032 |
Transparencies from the DOE/NSF 2001 Progress Review talk of D. H. Beck
- D. Beck, June 2001 (PowerPoint source, 21.4 MB) |
| G0-01-033 |
G0 Readiness Review II - The G0 Collaboration,
August 31, 2000 (Gnu-zipped postscript, 2.08 Mb) (Gnu-zipped tar archive of sources, 1.96 Mb) |
| G0-01-035 |
Report of the Second G0 Readiness Review - D. Mack (editor),
September 21, 2001 (Gnu-zipped postscript, 158 kb) |
| G0-01-040 |
The G0 Experiment, Progress Update to PAC 20 (Transparencies)
- D. Beck, July 17 2001 (Gnu-zipped Portable Document Format, 940 kB) |
| G0-01-041 |
The G0 Experiment, Backward Angle Measurements,
A Proposal to PAC 20 (Transparencies)
- D. Beck, July 17 2001 (Gnu-zipped Portable Document Format, 1.03 MB) |
| G0-02-003 |
Conduct of Operations (COO) for Hall C Experiment E00-006
(Obsolete, see G0-03-104)
- N. Chant and the G0 Collaboration, September 19, 2002 (Portable Document Format, 148 kb) (Gnu-zipped Postscript, 366 kb) |
| G0-02-004 |
Response to Issues and Concerns from Second G0 Readiness Review
- A. Lung and P. Roos for the G0 Collaboration,
January 12, 2002 (Gnu-zipped MS Word, 19.5 kb) (Portable Document Format, 8.33 kb) |
| G0-02-005 |
Report of the Second G0 Readiness Review
- D. J. Mack, B. Manzlak, R. Michaels, and
M. Seely, January 14, 2002 (Gnu-zipped Postscript, 276 kb) |
| G0-02-017 |
Conduct of Operations (COO) for Hall C Installations, Experiment G0
- R. Ent, Updated April 19, 2002 (Note: This version may not be the most recent. The official and, therefore, most up-to-date version is kept on the JLab Documentation Archive for G0.) (Portable Document Format, 91.7 kb) (Gnu-zipped Postscript, 239 kb) |
| G0-02-018 |
Memorandum of Understanding Between SURA/TJNAF and UIUC for Nuclear
Physics Research on the G0 Experiment (5th draft)
- C. Leeman, L. Cardman, R. Ent, A. Lung, and
D. Beck, April 8, 2002 (Gnu-zipped MS Word, 29.3 kb) (Portable Document Format, 74.0 kb) |
| G0-02-045 |
Experiment Safety Assesment Document (ESAD) for the Forward Angle Phase
of the G0 Experiment
(Obsolete, see G0-03-103)
- P. Roos and J. Roche, October 21, 2002 (Portable Document Format, 602 kb) (Gnu-zipped Postscript, 4.13 Mb) (Gnu-zipped tar archive of LaTeX Source, 6.35 Mb) |
| G0-02-057 |
EH&S Review (Part 1) of Experiment E00-006 ("G0"), Charge and Agenda
- R. Ent, August 14, 2002 (Portable Document Format, 28.7 kb) (Gnu-zipped Postscript, 118 kb) |
| G0-02-058 |
G0 Spectrometer ES&H Review (Part 1) Final Report
- G. Dodson (Chair), J-P. Chen, B. Manzlak, E. Smith,
M. Spata, and W. Vulcan, August 14, 2002 (Portable Document Format, 16.2 kb) (Gnu-zipped MS Word, 8.14 kb) |
| G0-02-059 |
EH&S Review (Part 2) of Experiment E00-006 ("G0"), Charge and Agenda
- R. Ent, September 19, 2002 (Portable Document Format, 27.6 kb) (Gnu-zipped Postscript, 35.9 kb) |
| G0-02-063 |
G0 Spectrometer ES&H Accelerator Readiness Review (Part 2) Final Report
- G. Dodson (Chair), J-P. Chen, B. Manzlak, E. Smith,
N. Okay, and W. Vulcan, September 19, 2002 (Portable Document Format, 30.6 kb) (Gnu-zipped MS Word, 10.3 kb) |
| G0-02-081 |
Radiological Safety Analysis Document (RSAD), Experiment E00-006
(Obsolete, see G0-03-105)
- A. Lung and the G0 Collaboration, August 20, 2002 (Portable Document Format, 24.6 kb) (Gnu-zipped Postscript, 43.4 kb) |
| G0-02-086 |
G0 Project FY02 Status Report - A. Lung, S. Pate,
G. Biallas, and S. Williamson, October 8, 2002 (Portable Document Format, 540 kb) (Gnu-zipped MS Word, 1.44 Mb) |
| G0-03-103 |
Experiment Safety Assesment Document (ESAD) for the Forward Angle Phase
of the G0 Experiment (updated for 2003-2004 running)
- J. Roche, November 13, 2003
(Note: This version may not be the most recent. The official and, therefore,
most up-to-date version is kept on the
JLab Documentation Archive for G0.) (Portable Document Format, 1.21 Mb) (Gnu-zipped Postscript, 3.90 Mb) (Gnu-zipped tar archive of LaTeX Source, 3.83 Mb) |
| G0-03-104 |
Conduct of Operations (COO) for Hall C Experiment E00-006 (updated for 2003-2004
running)
- J. Roche and the G0 Collaboration, November 12, 2003
(Note: This version may not be the most recent. The official and, therefore,
most up-to-date version is kept on the
JLab Documentation Archive for G0.) (Portable Document Format, 232 kb) (Gnu-zipped Postscript, 75.7 kb) (Gnu-zipped tar archive of LaTeX Source, 19.9 kb) |
| G0-03-105 |
Information to Establish the Radiological Safety Analysis Document (RSAD) for
G0 Running in Fall 2003 and Spring 2004
- J. Roche and the G0 Collaboration, October 7, 2003
(Note: This version may not be the most recent. The official and, therefore,
most up-to-date version is kept on the
JLab Documentation Archive for G0.) (Portable Document Format, 877 kb) (Gnu-zipped Postscript, 1.45 Mb) (Gnu-zipped tar archive of LaTeX Source, 1.42 Mb) |
| G0-03-109 |
Measurement of the Vector Analyzing Power in e-p Scattering Using the G0 Forward Angle Apparatus
- P. King, S. Wells, and the G0 Collaboration,
December 8, 2003 (Portable Document Format, 167 kb) |
| G0-04-001 |
Results from the G0 Engineering Runs (Answers to s Questions)
- The G0 Collaboration, March 5, 2004 (Portable Document Format, 3.07 Mb) (Gnu-zipped Postscript, 713 kb) |
| G0-04-002 |
The G0 Experiment, Backward Angle Measurements Update
(PAC26 Jeopardy Proposal)
- The G0 Collaboration, May 24, 2004 (Portable Document Format, 1.73 Mb) (Gnu-zipped Postscript, 6.39 kb) (Gnu-zipped tar archive of LaTeX source, 6.28 Mb) (Cover Material, Portable Document Format, 632 kB) |
| G0-04-003 |
Measurement of the Parity Violating Asymmetry in the N->DELTA Transition
(Originally E97-104)
(PAC26 Jeopardy Proposal)
- S. P. Wells (cospokesman), N. Simicevic (cospokesman),
and the G0 Collaboration, May 24, 2004 (Portable Document Format, 776 kb) (Gnu-zipped Postscript, 1.13 Mb) |
| G0-04-004 |
Measururing the Two-photon Exchange Amplitude with Vector Analyzing Powers
in Elastic Electron-proton Scattering
(A Proposal to JLab PAC26)
- S. P. Wells (contact person), P. King (contact person),
and the G0 Collaboration, May 24, 2004 (Portable Document Format, 243 kb) (Gnu-zipped Postscript, 98.8 kb) |
| G0-04-043 |
(Portable Document Format, 823 kb) (Gnu-zipped MS Word, 894 kb) |
| G0-04-066 |
(Portable Document Format, 1.59 Mb) (Gnu-zipped MS PowerPoint, 8.44 Mb) |
| G0-04-084 |
(Portable Document Format, 75.4 kb) (Gnu-zipped MS Word, 6.87 kb) |
The links below take you to project plans associated with the G0 experiment.
Some plans are stored as .gif images which should be displayed directly by your browser.
Other plans are stored as postscript files compressed with Gnu zip. Your browser may automatically unzip these files and then display them on your terminal if you have installed the appropriate helper program (such as ghostview). If you would like to download the Gnu-zipped file (of any "unlocked schedule"), use anonymous FTP at the site ftp.npl.uiuc.edu (see README in pub/G0/pplan/).
Suggestions for dealing with G0 schedule and budget worries.