List of G0 Operation Manuals System Responsible Due Date 1. Magnet Williamson/Nathan 9/02 a) Expert: Cooldown Procedure b) Expert: Ramping Current c) Routine Operation and Monitoring 2. Target Gustafsson/Carr 6/02 a) Routine Operation and Monitoring b) Target Motion c) Expert: Gas Panel d) Expert: Cooldown Fill/Empty Procedure 3. Beam and Beam Line Pitt 10/02 a) Feedback Controls, 1/2 wave plate Pitt b) HARP scans, raster, beam set-up Rutledge c) Helicity Signals Pitt d) Modulation System (coil pulsing) Rutledge e) BPMs, BCMs Carlini 4. Detectors Armstrong 6/02 a) High Voltage Control Papavassiliou b) North American Detectors Roche/Roos c) French Detectors Real/Kox d) Gain Monitoring System Pate 5. Electronics Quinn 10/02 a) Time Encoding (French) Furget b) Time Encoding (NA) Clark c) Monitoring (FASTBUS) King 6. DAQ Wood 10/02 a) CODA King b) Trigger King d) Slow Controls (EPICS) Papavassiliou e) G0 Acquisition/Analysis Korsch f) g0 Root Lenoble 6. Moller Polarimeter Fenker complete