Draft G0 Project Plan: December 23, 1997

There are two versions of the project plan on this page. The first is meant to be viewed on the screen, but does not contain the detailed dates for each task. The second has dates for each task but characters too small to view on screen. That version will, however, print legibly. Two different formats for the "printable" version are available. Both are stored as tar'ed and gzipped archives. The first format is the one originally produced by MS Project but which did not print correctly at some institutions. The second format includes some additional postscript commands to rotate the output by 90 degrees for better printing.

The plan below is in the form of a GANTT chart. These pages are legible using ghostview (at least the version at Illinois on a good Xterm). Using the portrait format (using the center mouse button) and the ledger media type (again using the center mouse button - I have to switch first to tabloid and then ledger or vice versa) should give an acceptable, right-side-up view. The annotations for each page indicate the section of the project as well as the range of WBS numbers (and task numbers - those on the far left of the project chart).

Page 1: Magnet - BWXT: WBS 1.1.1 - 1.1.3 (1-15)
Page 2: Magnet - BWXT: WBS 1.1.4 - 1.1.10 (16-30)
Page 3: Magnet - BWXT, Collimators: WBS 1.1.10 - 1.2 (31-45)
Page 4: Magnet - Carriage, Shielding: WBS 1.3 - 1.5 (46-60)
Page 5: Magnet - Shielding, Vacuum, Installation: WBS 1.6 - 1.11 (61-75)
Page 6: Magnet, Detectors: WBS 1.12 - 2.2 (76-90)
Page 7: Detectors - FPD: WBS 2.2.1 - 2.2.2 (91-105)
Page 8: Detectors - FPD, CED: WBS 2.2.2 - 2.3.2 (106-120)
Page 9: Detectors - CED: WBS 2.3.3 - 2.3.4 (121-135)
Page 10: Detectors - Phototubes, Gain monitor: WBS 2.4 - 2.6 (136-150)
Page 11: Detector support: WBS 2.6 - 2.8 (151-165)
Page 12: Detector testing, Electronics: WBS 2.8 - 3.2 (166-180)
Page 13: Electronics - Munger, fanout boards: WBS 3.3 - 3.4 (181-195)
Page 14: Electronics - Discriminators, Scalers: WBS 3.5 - 3.7 (196-210)
Page 15: Electronics - ADC's, CED elec.: WBS 3.8 - 3.9 (211-225)
Page 16: Electronics - cables, crates, installation, testing: WBS 3.11 - 3.15 (226-240)
Page 17: Data acquisition, Target: WBS 4 - 5.2 (241-255)
Page 18: Target - Moving mechanism, Rollout, Extraction: WBS 5.3 - 5.5 (256-270)
Page 19: Target - Gas panel, Hall plumbing, Control system: WBS 5.7 - 5.9 (271-285)
Page 20: Beam monitors - Cavities, Electronics: WBS 6.1 - 6.2 (286-300)
Page 21: Beam monitors electronics, Simulations: WBS 6.2 - 7.1 (301-315)
Page 22: UIUC Liquifier: WBS 8.1 - 8.4 (316-330)
Page 23: UIUC Liquifier: WBS 8.4 (331-333)


A more detailed schedule (also 23 pages), probably only suitable for printing, is contained in the following archives.

The original format produced by MS Project. It may not print correctly on your printer though.

A modified format in which commands are included to rotate the output by 90 degrees for better printing at some institutions.