Draft G0 Infrastructure Project Plans: February 2, 1998

The plans here are draft versions of schedules for a number of "infrastructure" related operations. These were generated by Paul Brindza in order to estimate the cost and scheduling impact of the G0 experiment for the CSR report. Separate pages of the plans are stored as black-and-white gnu-zipped postscript. They were originally provided by Roger Carlini as grey-scale jpeg images from scanned-in hard-copy.

Schedule for 180 degree turn-around
Page 1
Page 2

Schedule for turn-on and shut-down of G0, once the initial installation is completed
Page 1

Initial installation of G0
Page 1
Page 2
Page 3