G0 Cryolines for Hall C

These pictures were taken at the facilities of Ability Engineering (South Holland, IL) and at Jefferson lab. They show the rigid G0 cryolines needed to transport cryogens to the experiment along the perimeter of Hall C, as well as "well heads" for providing connections to flexible transfer lines which actually bring cryogens to the target and magnet. These photos were provided by Paul Brindza. Click on an image to view an enlargement. All photos are in jpeg format. They are also available from the G0 ftp site.

This first set of pictures was taken at Ability Engineering during an inspection trip by Paul Brindza on June 7, 2000.

54 kb

56 kb

64 kb

49 kb

59 kb

41 kb

49 kb

62 kb

39 kb

50 kb

60 kb

65 kb
 
On June 12, 2000 the first two truckloads of G0 transfer line arrived at JLab around 10:00 AM.

59 kb

59 kb

61 kb

60 kb

155 kb

62 kb

58 kb

58 kb
 
The final delivery of the G0 transfer lines was completed on June 21, 2000. One of the G0 U-tubes (and the Kaon U-tube) also arrived. The remaining cryo fabrication work for G0 consists of the coaxial transfer line due to be shipped to UIUC in 1-2 months and an addittional U-tube due in about 1 month.

66 kb

67 kb

65 kb

59 kb

61 kb

62 kb


Go to G0 homepage

Send additions and corrections to
Steven Williamson.