The provision of infrastructure for the experiment is generally the responsibility of JLab. Infrastructure equipment includes beamline monitors, the beam raster system, cryogenic systems to provide cryogens (LHe and LN2) to the target and SMS, detector shielding, portions of the cabling, high voltage supplies, modular electronics crates, data acquisition support hardware (computers, air conditioning, etc.), and the Hall C Moller Polarimeter facility.
For the latest status report (as of December, 1998) on the infrastructure
of the G0 experiment, see the
appropriate section of the Report to PAC15.
Ealier status information can be found in the
Cost and Schedule Review Report
.
| G0 Doc. No. | |
|---|---|
| G0-00-006 |
G0 Infrastructure Interface Control Document
- S. Pate, B. Beise, C. Jones, M. Pitt, G. Smith,
S. Williamson, Updated June 2000 (Gnu-zipped postscript, 355 kb) |
| G0-04-047 |
(Portable Document Format, 1.25 Mb) (Gnu-zipped MS PowerPoint, 1.63 Mb) |
| G0-05-019 |
(Portable Document Format, 4.46 Mb) (Gnu-zipped MS PowerPoint, 1.13 Mb) |